Strata solutions
Strata car parks and driveways lifted back to level.
Trip hazards gone. Water runs off, not in.
Sunken car-park slabs, driveways, paths and courtyards lifted back to level through coin-sized holes, trip hazards removed and the fall corrected so water runs away from the buildings.
- Done a few bays at a time — cars moved along, not out
- No saw cut, no repour, no weeks of fencing
- 20-year product and workmanship warranty
Structural Engineers · Licensed Builders · Skilled Technicians
- 15,000+
- Jobs completed since 2011
- 20-year
- Product and workmanship warranty
- $20M
- Public liability insurance
- 1,504
- Five-star reviews
Solutions
Strata car park and driveway repairs, with the cars moved along, not out.
Lift the slab. Fix the fall. Keep the water out.
A common-property slab has two jobs: carry people and cars safely, and send the rain away from the buildings. A slab that has dropped fails at both. A lip at a joint becomes a trip hazard on the committee’s register; a fall that has gone the wrong way sends water to a garage door, the basement or the base of a wall, and the footings beside it start to move too.
Take the trip hazard off the register and the water off the building: lift the slab back to level, with the fall corrected. Problem solved.
Why the slab has dropped
A sunken slab is usually a void. Water from a drain, a downpipe or a leaking pit washes the fill out from underneath, or fill that was never compacted settles, and the concrete follows it down. The slab itself is usually fine.
The conventional fix
Grind the lip off, or cut the panels out and repour. Grinding leaves the low side where it is, so the water still runs the wrong way; repouring means the area fenced for days, cars on the street and residents walking around it. Both work. For a strata car park, the closure is the cost.
How the slab is lifted
Slab jacking is the industry’s name for lifting a sunken slab with resin: slab lifting with resin. The resin is GeoPoly™, made by Buildfix, in the SJ120 grade formulated for trafficked slabs. It goes in as a liquid through coin-sized holes in the low panel, then expands and hardens as it cures. That does two things at once: it fills the void and firms the ground beneath, and it lifts the slab back to level, the fall corrected so water runs off again. Below the ground and above the ground, both fixed permanently.
What to expect on the day
On the day: one truck parked on the street, a hose to the work zone, cones around the bays being lifted. Residents’ cars are moved a few bays along, not out of the building, while each panel comes up level in front of them. The holes are patched flush, the bays are handed back, and the crew moves to the next section with the car park open throughout.
If you sit on the committee, manage the building for the owners corporation or look after its common property, these are the exact jobs Buildfix can help you with. Book a site assessment online and the dates come back by email, or call 1300 854 115 and talk it through with the team first.
Structural Engineers · Licensed Builders · Skilled Technicians
Brisbane City Council · Roma Street Parkland
Walkways and bikeway relevelled, the crossfall corrected
Ormeau, QLD
Pool surround relevelled, no tiles lifted
Residential complex · Runaway Bay, QLD
Tennis court lifted 100 mm through the playing surface
Strata case studies
Car parks, paths and common-area slabs relevelled, on the record.
A residential complex's tennis court lifted 100 mm, a rear path that was funnelling water under a six-unit block, sixteen hectares of public walkways with the crossfall corrected and a driveway carrying 14-tonne fire trucks. Tap a card to read one.
Also for strata: apartment buildings and unit blockstownhouse and villa complexes
Ground engineering technologies
Commercial-grade engineered resins that lead the industry.
GeoPoly™ is a family of ground engineering resins formulated, blended and batch-tested by Buildfix. Density, expansion, compressive strength and set time are measured on every batch by the Buildfix chemists who made it, in the Buildfix lab, so the material specified for a job is the material that goes into the ground.
Because the formulation is Buildfix's own, the right resin goes on the right job — a denser grade under a trafficked slab, a slower rise under a light pier, a batch for deep voids. Read the data sheets below. On this page the grade is SJ120 — the slab-lifting resin, formulated for the open void beneath a trafficked slab.
Batch-tested.
Every batch is measured for density, expansion, strength and set in the Buildfix lab before it leaves the facility.
Three grades, one range.
SJ120 for trafficked slabs, GER60 for deep foundations, PSR30 for piers. Each formulated for its load and its ground.
Warranted by the manufacturer.
A 20-year product and workmanship warranty from the company that formulated the resin and carried out the work.

Cured GeoPoly™ exposed on a completed repair.
Project delivery
Car park and driveway levelling, start to finish.
How a commercial job runs with Buildfix — from the first visit to the warranty certificate, with the site trading throughout.
Backed for 20 years.
Product and workmanship warranty, in writing, on every repair.
Backed for 20 years.
Product and workmanship warranty, in writing, on every repair.
With Buildfix, your repair is backed for 20 years, labour and materials. If the issue returns, so does Buildfix — at no cost to you.
Structural Engineers · Licensed Builders · Skilled Technicians
Clients and partners
Trusted by
Property groups, councils, government agencies and builders — the organisations whose buildings and sites Buildfix has lifted, levelled and repaired.

Brisbane City Council

Royal Australian Air Force

Mirvac

NSW Ambulance

Built

Uniting Church in Australia

Endeavour Energy

CSIRO

Urban Property Group

Cordina Farms
Managing a strata portfolio?
A partner account gives your strata management business 30-day terms, a dedicated structural engineer, an assigned account manager and access to the job management portal — across NSW, VIC, QLD and the ACT.
Questions?
The questions committees, strata managers and building managers ask before a job on common property. Monday to Friday, 8am to 5pm AEST on 1300 854 115.

Need a building assessed?
Levels measured, cause identified, and a written scope with a fixed price for the committee. Site assessments are free.
Call 1300 854 115Structural Engineers · Licensed Builders · Skilled Technicians
Buildfix Strata
Get in touch with us.
Book an assessment online or call us to discuss your building's structural issues. Our team is here to help.
Structural Engineers · Licensed Builders · Skilled Technicians
- Office hours
- Monday to Friday, 8am to 5pm AEST
- Service area
- Sydney · Melbourne · Brisbane · Canberra










