Our Work in Queensland

Yard Slabs Lifted 29mm. Client Booked Again.Commercial

Bundamba, QLD

Yard Slabs Lifted 29mm. Client Booked Again.

Sections of the hardstand at Hume Masterpanel’s Bundamba warehouse had dropped at the joints. GeoPoly™ lifted them 29mm in a day, at the quoted price. Seven months later the client booked the next section.

Read case study
Fire Station Driveway Stabilised in a DayCommercial

Camp Hill, QLD

Fire Station Driveway Stabilised in a Day

The driveway slab at Camp Hill Fire Station was flexing under 14-tonne fire trucks. GeoPoly™ stabilised and relevelled it, a day per side — the station never went offline.

Read case study
Sinking Garage Lifted 45mm — Harleys and AllHomeowner

Loganholme, QLD

Sinking Garage Lifted 45mm — Harleys and All

A garage sinking for over two decades on poorly prepared soil. GeoPoly™ lifted the slab 45mm in under four hours — the Harleys never moved.

Read case study
Roma Street Parkland Walkways RelevelledCommercial

Brisbane CBD, QLD

Roma Street Parkland Walkways Relevelled

Sunken stairs, walkways, and bikeways across 16 hectares of public parkland. Brisbane City Council has used Buildfix to relevel affected sections.

Read case study
Dining Floor Relevelled — Not a Tile BrokenHomeowner

Raceview, QLD

Dining Floor Relevelled — Not a Tile Broken

A sinking dining room floor on reactive black soil — relevelled in one day through 1cm holes in the grout joints, without breaking a single tile.

Read case study
Pool Surround Relevelled — No Tiles LiftedHomeowner

Ormeau, QLD

Pool Surround Relevelled — No Tiles Lifted

Sections of the tiled pool surround had sunk, creating uneven edges and a daily safety hazard around water. Relevelled without pulling up a single tile.

Read case study
Sunken Tennis Court Lifted 100mmCommercial

Runaway Bay, QLD

Sunken Tennis Court Lifted 100mm

A tennis court at a residential complex had dropped 100mm — a genuine trip hazard. GeoPoly™ lifted it back to level without reconstructing the surface.

Read case study
Stumps Raised and Floors LevelledHomeowner

Southport, QLD

Stumps Raised and Floors Levelled

Sloping floors, cracked tiles, and sunken stumps — this investment property needed to be tenant-ready fast. GeoPoly™ got it done at a fraction of the cost of restumping.

Read case study
Crumbling Bricks No Bricklayer Could FixStrata

Ashgrove, QLD

Crumbling Bricks No Bricklayer Could Fix

Strata committee dealing with crumbling brickwork that no tradesperson seems able to fix? The problem might not be the bricks — it might be what’s happening behind them. Book a free damp assessment for your building.

Read case study
Cracked Brick Veneer Bungalow StabilisedHomeowner

Sunnybank Hills, QLD

Cracked Brick Veneer Bungalow Stabilised

Years of Queensland drought shrank the clay away from this 1980s slab-on-ground bungalow until the brick veneer step-cracked and a 20mm gap opened at the windows. GeoPoly™ filled the voids and closed the cracks in a day.

Read case study
Sinking Waffle Slab Home Lifted 15mmHomeowner

Morayfield, QLD

Sinking Waffle Slab Home Lifted 15mm

A 15-year-old Morayfield home on a waffle slab was sinking so fast the tenants felt like they were walking up and down hills. GeoPoly™ filled the voids under the slab and lifted the house 15mm in a day.

Read case study
Water Tank Slab Lifted 150mm Back to LevelHomeowner

Ipswich, QLD

Water Tank Slab Lifted 150mm Back to Level

A full 5,000-litre rainwater tank had dropped its slab by 150mm and was pulling the corner of the house with it. The slab was lifted the full 150mm back to level, tank still full.

Read case study
Pool Slab Lifted Back After Cyclone DebbieHomeowner

Broadbeach Waters, QLD

Pool Slab Lifted Back After Cyclone Debbie

Cyclone Debbie shifted the reclaimed land under this Broadbeach Waters pool and its surround sank almost 60mm towards the canal. GeoPoly™ lifted the slab back in a day and a half without moving it.

Read case study
Queenslander Saved From Sinking in 2 HoursHomeowner

South Brisbane, QLD

Queenslander Saved From Sinking in 2 Hours

A South Brisbane Queenslander with a 10-tonne water tank and a living area built in underneath was sinking. The cause was a leaking drain, and GeoPoly™ stabilised the whole house in 2 hours.

Read case study
Cut and Fill Home Stopped From SlidingHomeowner

The Gap, QLD

Cut and Fill Home Stopped From Sliding

Five years of movement, dozens of builders, no answers. The timber retaining walls on this cut and fill block in The Gap had failed and the slab was sliding with the fill. GeoPoly™ sealed the voids and lifted the house back to level in two days.

Read case study