Commercial solutions

Commercial underpinning and structural repairs.

No digging. The building stays occupied.

Commercial underpinning by resin injection: the ground beneath the footings is compacted, the movement stops, floors level and walls lift back — most jobs take a day or two, and the building is used as normal throughout.

  • Tenants and staff stay in the building throughout
  • Close cracks, level floors
  • 20-year product and workmanship warranty
Call 1300 854 115

Structural Engineers · Licensed Builders · Skilled Technicians

0:00 / 0:00

Solutions

Commercial foundation repair and wall reconnection, with the building open.

Firm the ground. Stop the movement. Lift the footings.

A commercial building has one job: keep performing for the people inside it and the balance sheet it sits on. A building that is sinking works against both. The cracks widen a little each season, doors stop closing, a tenant mentions the floor, and an engineer’s report lands on the desk with a repair in it nobody wants to start.

So it waits, because the conventional answer means moving people out for months, and every month it waits the movement carries on. Stabilise the ground and close the cracks in one job: commercial underpinning, with the tenants inside. Problem solved.

Why the building is moving

Commercial foundation repair starts in the ground, not the wall: reactive clay shrinking through dry months, fill washing out beneath the footings, tree roots drawing moisture from one side of the building. The wall only shows it.

The conventional fix

Traditional underpinning: trenches beside the footings, mass concrete poured in stages, engineers, certifiers and contractors on site for months and the tenants somewhere else. It works. For an occupied building the move-out usually costs more than the concrete.

How the building is lifted

Underpinning is the industry’s name for putting support back under a footing that has sunk. Buildfix underpins the building with resin instead of concrete. The resin is GeoPoly™, made by Buildfix, in the GER60 grade formulated for the ground beneath footings. It goes in as a liquid through coin-sized holes beside the footings, reaches beyond 3 metres, then expands to 25 times its volume and hardens as it cures. That does two things at once: it compacts the ground so the footing stops moving, and it lifts the footing: floors level and walls lift back. Below the ground and above the ground, both fixed permanently.

What to expect on the day

Where the walls cracked above the footings, HelicalBar™ stainless bars are set into the mortar joints across the crack, and structural crack repair with HelicalBar™ reconnects the masonry. Nothing is dug out and nobody moves out: the crew works from outside and beneath while the building carries on above, the lift is watched on laser levels to the design, and the footings come up over days, not months. On a heritage building the lift is set for the building’s age and the finish matched to the original.

If you own or manage a commercial building, or hold it for a council, a department or a portfolio, these are the exact jobs Buildfix can help you with. Book a site assessment online and the dates come back by email, or call 1300 854 115 and talk it through with the team first.

Call 1300 854 115

Structural Engineers · Licensed Builders · Skilled Technicians

Commercial case studies

Commercial buildings stabilised and relevelled, on the record.

A national research facility, a 95-year-old school, a fire station, a heritage wall and a 1920s apartment block. Footings lifted and walls reconnected, with the building occupied. Tap a card to read one.

Ground engineering technologies

Commercial-grade engineered resins that lead the industry.

GeoPoly™ is a family of ground engineering resins formulated, blended and batch-tested by Buildfix. Density, expansion, compressive strength and set time are measured on every batch by the Buildfix chemists who made it, in the Buildfix lab, so the material specified for a job is the material that goes into the ground.

Because the formulation is Buildfix's own, the right resin goes on the right job — a denser grade under a trafficked slab, a slower rise under a light pier, a batch for deep voids. Read the data sheets below. On this page the grade is GER60 — the ground engineering resin, injected to 3 metres beneath the footings.

  • Batch-tested.

    Every batch is measured for density, expansion, strength and set in the Buildfix lab before it leaves the facility.

  • Three grades, one range.

    SJ120 for trafficked slabs, GER60 for deep foundations, PSR30 for piers. Each formulated for its load and its ground.

  • Warranted by the manufacturer.

    A 20-year product and workmanship warranty from the company that formulated the resin and carried out the work.

Project delivery

Commercial underpinning, start to finish.

How a commercial job runs with Buildfix — from the first visit to the warranty certificate, with the site trading throughout.

Buildfix structural engineer walking a commercial carpark slab with the client, pointing out the jointStep 1

Site assessment by a structural engineer

A structural engineer walks the site: floor levels, slab edges, footings, drainage and services. The cause is named on the day and the repair is designed around how your site operates, not the other way round.

Buildfix scope package showing structural repair detail, cover page and method statementStep 2

Repair design and fixed-price scope

A written scope with the repair detail, a method statement and one fixed price. No per-kilo resin charges, no allowances, no variation when the voids run bigger than estimated. The quote is the invoice.

Buildfix technician locating underground services on a commercial slab with a cable locator, marks sprayed on the concreteStep 3

Services located, site set up

Underground services are located and marked and the drainage inspected by CCTV before a hole is drilled. Each morning starts with a pre-work safety check, a brief and the SWMS. Work areas are cordoned off, foot traffic is diverted to safer paths where there are any, and the work is staged in zones so the site keeps trading around the crew.

Buildfix technician injecting GeoPoly™ through a commercial slab, laser levels on tripods monitoring the liftStep 4

Injection and laser-monitored lift

GeoPoly™ goes in through 10–20 mm holes and the slab lifts against laser levels, millimetre by millimetre, to the target level. Trafficable 30 minutes after the lift — forklifts, trucks and the public included.

Buildfix completion pack: the 20-year warranty certificate, the technicians' site report with before-and-after levels, and the photo recordStep 5

Verification and completion pack

Levels are re-checked at every station before the crew leaves. The completion pack follows: the technicians' site report, the before-and-after record — levels and photos — and the 20-year product and workmanship warranty certificate. Three documents, one company's name on all of them.

Backed for 20 years.

Product and workmanship warranty, in writing, on every repair.

20YEARSWARRANTY

With Buildfix, your repair is backed for 20 years, labour and materials. If the issue returns, so does Buildfix — at no cost to you.

Call 1300 854 115

Structural Engineers · Licensed Builders · Skilled Technicians

Clients and partners

Trusted by

Councils, government agencies, builders and property groups — the organisations whose buildings and sites Buildfix has lifted, levelled and repaired.

  • Brisbane City Council

    Brisbane City Council

  • Royal Australian Air Force

    Royal Australian Air Force

  • Mirvac

    Mirvac

  • NSW Ambulance

    NSW Ambulance

  • Built

    Built

  • Uniting Church in Australia

    Uniting Church in Australia

  • Endeavour Energy

    Endeavour Energy

  • CSIRO

    CSIRO

  • Urban Property Group

    Urban Property Group

  • Cordina Farms

    Cordina Farms

Managing a portfolio, or a pipeline of sites?

A partner account gives your business 30-day terms, a dedicated structural engineer, an assigned account manager and access to the job management portal — across NSW, VIC, QLD and the ACT.

Questions?

The questions engineers, asset managers and business owners ask before a commercial job. Monday to Friday, 8am to 5pm AEST on 1300 854 115.

Buildfix engineer on a tablet beside laser levels on a commercial carpark

Need a site assessed?

Levels measured, cause identified, and a written scope with a fixed price. Site assessments are free.

Call 1300 854 115

Structural Engineers · Licensed Builders · Skilled Technicians