A back corner 300mm down, and a court nobody could play on
Outside a Hunter Valley property, the back corner of a tennis court had cracked due to sloping downwards a monstrous 300mm. With the downward slope towards the back corner and a large crack in the tennis court, the court could no longer be used by the owner or local tennis players.
The owner of the tennis court had initially contacted a plumber as they suspected a stormwater drain under the court had broken. They were right.
The plumber used a CCTV camera to get under the court to diagnose the problem and found a significant amount of foundation soil had washed away, leading to the collapse of the court.
Knowing Buildfix to be experts at relevelling concrete slabs, the owner got in touch for a permanent solution.

A large void where the foundation soil used to be
Upon our arrival we carried out our usual analysis process but it didn't take much for us to determine the plumber had been correct in his assumptions.
Foundation soil had indeed been washed away and a large gap was staring at us from underneath the court. The problem was glaringly obvious.
In anticipation of our arrival, the owner of this Hunter Valley property had already rerouted the stormwater drainage from the house away from the tennis court.
This allowed our team to begin deploying our solution.

Fill the void, solidify the ground, then lift
As so much foundation soil had been washed away, the first thing we needed to do was give the tennis court something stable to sit back on.
In order to do this, we used our proprietary geopolymer resin solution, GeoPoly™. We drilled access holes in strategically chosen points on the tennis court. Through the access holes, we injected GeoPoly™ into the eroded soil.
By doing so, we were able to fill the large voids under the tennis court as well as solidify the ground so sinking would never occur again.

Raised 300mm, back in play
With our proprietary technology and progressive techniques we were able to lift the tennis court back up by a huge 300mm. Considering the weight of such a large concrete slab, this is a significant achievement.
Later, the owner of the tennis court had the cracks repaired by local builders to remove any trip hazards. This repaired the court so it could be played on again.
With the stormwater drainage rerouted and the tennis court sitting on a stable surface, the owner and local tennis players are now able to play on the court with complete confidence.
A court, slab or driveway down on one side after a drain let go? A free assessment measures the fall, checks what is left under the concrete, and tells you what it takes to get it back in play.

Share this case study
Related Articles

Dining Floor Relevelled — Not a Tile Broken
A sinking dining room floor on reactive black soil — relevelled in one day through 1cm holes in the grout joints, without breaking a single tile.
Read More
Roma Street Parkland Walkways Relevelled
Sunken stairs, walkways, and bikeways across 16 hectares of public parkland. Brisbane City Council has used Buildfix to relevel affected sections.
Read More
Warehouse Yard Lifted 35mm in 4 Hours
The yard slab at Rylock’s Dingley Village warehouse had dropped 35mm at the joints under forklift and truck traffic. GeoPoly™ lifted it back to level in a morning, with the staff watching.
Read More
Seeing something similar at your property?