Newtown Party Wall Secured After a Fire
- 1 yearHow long the wall had been moving before the fire
- 1 dayGround stabilised and the party wall underpinned
- 0Bricks moved
A wall that moved for a year, then set the power mains alight
Constructed at the turn of the century with a common party wall dividing two residences, this townhouse is common of this type in Newtown, Sydney.
Over the course of a year, the residents living on both sides of the party wall observed movement but thought nothing of it.
Out of the blue, the power mains on one side of the party wall erupted in a shower of sparks and began to smoulder. The Newtown fire brigade came and put it out quickly.
Alarmed by the severely deformed shape of the party wall, the fire brigade called a local builder who stopped the wall from shifting any further with temporary prop supports.
We were eventually called for a more permanent solution.

A disconnected drainpipe, years of water, and voids under the wall
Upon our arrival, we observed the severely misshapen party wall and began analysis. Our investigation led us to find a disconnected drainpipe underneath the verandas outside the townhouse.
The pipe had gone unnoticed and water had been seeping into the soil underneath the Newtown townhouse for years.
The water had pooled, eroded the soil and created voids underneath the party wall causing it to shift suddenly.
We determined that the fire had started because the shifting party wall had dragged electrical cables that were connected to the power mains.

Firm the ground first, then tie the wall back together
As the ground upon which the party wall sat was so unstable, we took to fixing the Newtown townhouse's foundations first. We injected our own unique ground stabilising solution, GeoPoly™ into the voids created by excess water from the disconnected drainpipe and into the soil itself.
This firmed up the ground beneath and underpinned the party wall. Afterwards we used our HelicalBar™ systems to reconnect the internal party walls to the external walls of the townhouse for further stability. All cracks and gaps were then filled smooth ready for a lick of paint.

Stable in a day, repaired the next
The residents on both sides of the Newtown townhouse had been told that repairs were going to be hugely expensive and take months. They were informed that because the party wall was so unstable, it would need to be torn down and the footing of the entire townhouse re-laid.
However, we were able to stabilise the footing and foundations of the townhouse without moving a single brick — within one day. We also completed structural repairs to the party wall the very next day. The party wall dividing the two residences of this Newtown townhouse now sits strong and stable.
Got a wall that has started to lean, bow or pull away from the one next to it? A free assessment measures the movement, finds what is moving the ground underneath, and tells you exactly what it will take to tie the wall back.

Share this case study
Related Articles

Terrace Wall and Façade Repaired
A large crack ran from bottom to top of this Victorian terrace’s gable end wall, threatening the chimney above. Buildfix stitched the wall closed with remedial ties — no bricks removed, no neighbours disturbed.
Read More
Walls Reconnected After Tie Failure
Both external walls of this 150-year-old double-brick home had been slowly separating from the internal load-bearing wall for decades. Buildfix replaced every failed tie — without removing a single brick.
Read More
80 Years of Hidden Wall Tie Corrosion
The brickwork looked perfect. Inside the cavity, 80 years of salt air had corroded every wall tie to failure. Buildfix installed over a thousand stainless steel replacements — without disturbing a single brick.
Read More